Arkansas Compute Campuses

The plain-English reference on what is being built across Arkansas, who is behind it, who supplies the power, and what communities can still ask for. Built from public records. Sources and unknowns shown, not just the verdict.

34facilities in Aterio's count
3,618estimated MW, Aterio (not committed load)
~87%of that MW from 4 named providers
6under construction (plus 4 operating, 24 announced)
Clarksville · ServerfarmWest Memphis · GoogleNear Wrightsville · AVAIOSheridan · Clean Cloud EnergyPort of Little Rock · GoogleConway · ForgelightEl Dorado · Z SquaredBono communityManilaGum Springs (cancelled)Helena Harbor (cancelled)JonesboroLittle Rock colocationNorth of TexarkanaMorelandRussellvilleHelena-West HelenaCave CityMonticelloNewarkHarrison (withdrawn)?ClarksvilleWest MemphisLittle RockSheridanEl DoradoILLUSTRATIVE · LOCATIONS APPROXIMATE · NOT TO SCALE
Serverfarm (covered)GoogleAVAIO DigitalClean Cloud EnergyOther named recordsCancelled / withdrawnUnnamed (NDAs)
Compute Campus Hotline — Have a question, or know something the public should know? Ask or report. You can leave your name off. Tips are checked against public records before anything is published.
Ask or report
Why this exists

Hard-to-find information, made public and plain

Arkansas is looking at one of the largest buildouts of computing power in its history. The facts are scattered across trackers, utility filings, county minutes, company pages, and local news, and some of it sits behind paywalls and NDAs.

Grey Swan gathers what is public into one place, marks clearly what is still unknown, and walks through each project one location at a time. Clarksville is first. As we finish each facility page, we release it here, and we aim to put breaking news on this hub first, then on Substack and socials.

The goal is simple: help neighbors, officials, and builders see the same facts, so each community can be a partner in the deal and not just a host.

This model works for any state. We are starting with Arkansas because this is home. The same public-records method (gather, verify, mark the unknowns, report in plain English) can travel.

A note on language. News reports and some project names use an older term. We call these compute campuses, because that is what they could be: community partnerships and real educational facilities where everyone can win.

Built from public records

Trackers, filings, official agendas, company pages, and local reporting, each one linked.

Known vs. unknown

Every page separates what is documented from what is not yet public.

In the public's interest

Free to read. Written for residents, councils, quorum courts, and reporters.

One at a time

Each facility gets its own page and article. Clarksville is first. We build this one location at a time and post breaking updates here first.

Why this is a grey swan

What Grey Swan research looks like

A grey swan, as we use the term, is 80% likely to 100% inevitable. These events happen all the time. Some are known and planned around, though people could be better prepared. Compute campuses are one: AI is here to stay, power is tight, and the buildout is already underway in Arkansas.

Steve's working forecast (judgment, not a promise)

Every new technology meets a rush, then fear, then argument. Over the next 12 months, we will learn how much this technology can help the people who need it most. As that becomes clearer, a lot of the fear will ease, and this can become a bipartisan solution, especially with nuclear power and nuclear fusion. That is not a promise that a fusion plant arrives next year, or that either party has already signed on. It is why communities should negotiate now, while uncertainty still leaves room for a better deal.

Likelihood

Likely to inevitable

Four facilities operating, six under construction, and 24 announced in Aterio's count (data as of November 9, 2026).

Timing

Already happening

Clarksville's first two buildings are targeted for January 2028. Other counties are negotiating now.

Impact

Business, community, family

Decisions signed now shape local power, water, land, jobs, and taxes for decades.

Power
Who owns the generation?
Water
What cools the servers?
Land & jobs
What is leased, and what is promised?
Taxes
Abatements, PILOTs, and terms

The method, shown as a report card

Step 1

Gather

Public records, utility filings, official agendas, local news, company pages, and trackers.

Step 2

Verify

Cross-check sources. Where they disagree, show both numbers instead of picking one.

Step 3

Mark the unknowns

Known vs. not yet public, side by side. Nothing hidden is invented.

Step 4

Report

A custom report and a short explainer, in plain English, with every source linked.

Known

Example: Clarksville's 65% abatement for up to 30 years, and the 43-acre lease at $1,000 a month, are in public reporting.

Unknown

Example: the parent company of Clarksville's tenant, Hatchbo LLC, is not public, and nine of Aterio's 34 facilities have no provider named. We leave them unmarked.

The same approach works on other grey swan subjects across God, Energy, Technology, and Money. It works for any state, starting with Arkansas, and for any industry that needs hard-to-find public information turned into a clear report.

See a sample reportWatch the explainersMembership
Explainer

Who is Aterio?

Aterio is a commercial research firm that tracks compute facilities across the U.S. Its public Arkansas summary is where the 34-facility and 3,618 MW figures come from.

Aterio counts individual buildings or phases as facilities, so 34 facilities is not 34 separately named campuses.

  • It tracks facilities. It counts buildings, estimated megawatts, and status (operating, under construction, announced).
  • It does not own them. Aterio is not a developer, an owner, or a party to any Arkansas deal.
  • Its full list is paid. The facility-level dataset is sold. Its public summary names providers and totals, not every building.
  • Estimates, not committed load. Aterio's MW figures are estimates. Developer figures sometimes differ, and we show both.
  • Paid is not the same as secret. A paywall on commercial research does not by itself prove anyone hid a government deal.

Aterio Arkansas summary · data as of Nov 9, 2026

At a glance

The Arkansas picture in four numbers

By status

34 facilities, Aterio, data as of Nov 9, 2026

34facilities
24 announced
6 under construction
4 operating

By provider (estimated MW)

Four providers: 25 facilities, about 87% of MW

Google · 10
966
AVAIO Digital · 7
957
Clean Cloud Energy · 4
800
Serverfarm · 4
432
Not identified · 9
463

"Not identified" MW is a computed residual (3,618 minus the four named providers).

CountyFacilitiesEstimated MWMain named project
Pulaski151,448AVAIO Digital Leo; Google Port of Little Rock
Grant4800Sheridan / Clean Cloud Energy
Crittenden5486Google West Memphis
Johnson4432Serverfarm ARK, Clarksville

County figures: Aterio public summary, data as of Nov 9, 2026. Selected counties shown.

Key Players report

Who is behind most of it

Facility counts and MW are Aterio estimates unless noted. Developer figures are labeled as developer figures.

10 facilities

Google

966est. MW (Aterio)
  • West Memphis / Project Pyramid (Crittenden): under construction / phased; 600 MW reported.
  • Port of Little Rock / Willowbend Capital (Pulaski): planned, redesign and permitting; $1B, five buildings reported.
  • Part of a $4B Arkansas announcement, with an Entergy partnership for new generation, batteries, and grid upgrades. Savings figures are company projections.
7 facilities

AVAIO Digital

957est. MW (Aterio)
  • Leo campus, 145th Street near Wrightsville (Pulaski): developer reports ground broken.
  • Developer states 296 acres, 570 MW grid plus 500 MW behind-the-meter; initial grid energization Q4 2027.
  • $6B initial announcement. Full county PILOT not verified.
4 facilities

Clean Cloud Energy

800est. MW (Aterio)
  • Sheridan campus, northwest of Sheridan (Grant): proposed; EdgeConneX due diligence reported.
  • Grant County's 20% abatement with six protections is a negotiating starting position, not signed final terms.
  • A separate 400 MW solar proposal is reported.
4 facilities

Serverfarm

432est. MW (Aterio)
  • ARK1–ARK4, Clarksville (Johnson): under construction; four 108 MW buildings; $6.6B.
  • About 660 MW of on-site gas generation reported; not city-owned.
  • Publishes planned workforce partnerships with local schools, Arkansas Tech, and University of the Ozarks. Read the Clarksville page.
Utilities and public power
  • Entergy Arkansas: partnership at Google West Memphis; operates Arkansas Nuclear One (two units, about 1,800 MW).
  • Clarksville Connected Utilities: 18 MW for Clarksville construction only, not the finished campus.
  • Conway Corp: says drinking water would not cool servers at the Conway proposal.
  • Southwestern Power Administration: markets federal Arkansas River hydropower (Dardanelle, Ozark) to public and cooperative customers.
Others in the public record
  • Forgelight Ventures LLC (Conway): end user unnamed.
  • Z Squared / Paradox Data (El Dorado): county moratorium reported.
  • Bentaus / Chadbourn Infrastructure Partners (Miller): announced; utility identity not confirmed.
  • BlockOps, Artemis Technologies, NewRays, BTC Digital: crypto and hosting operations.
  • TierPoint, Mainstream Technologies, Ritter: existing colocation.
The index

Two lists, measured differently

Aterio's count and Grey Swan's named list measure different things. A campus can be one named record and several Aterio facilities. Some of our 22 are crypto mines, older colocation sites, or cancelled projects. Do not subtract 22 from 34.

Block 1 · Aterio's count

Aterio's 34 facilities, by provider

Aterio counts 34 facilities in Arkansas (about 3,618 MW estimated): Google 10, AVAIO Digital 7, Clean Cloud Energy 4, Serverfarm 4, and 9 with no provider named in Aterio's public summary. Those are Aterio's building and phase counts, not 34 separately named campuses.

1Google
2Google
3Google
4Google
5Google
6Google
7Google
8Google
9Google
10Google
11AVAIO
12AVAIO
13AVAIO
14AVAIO
15AVAIO
16AVAIO
17AVAIO
18Clean Cloud
19Clean Cloud
20Clean Cloud
21Clean Cloud
22ARK1
23ARK2
24ARK3
25ARK4
Google · 10AVAIO Digital · 7Clean Cloud Energy · 4Serverfarm · 4 (covered)Provider not public · 9 (hidden)

Numbered slots are our way of picturing Aterio's totals. They are not Aterio's IDs or a copy of its paid list. The nine hidden slots stay unmarked; we don't guess names.

Block 2 · Grey Swan's own list

Our 22 named projects, plus 1 NDA proposal (Redfield)

Separately, Grey Swan tracks 22 named public records, plus one unnamed proposal near Redfield (Grant County NDAs; developer name redacted). Redfield sits outside the 22. Google's Port of Little Rock site near Sweet Home is counted once. The nine Aterio slots with no public provider stay unmarked on our pages; we don't invent names.

#ProjectPlace / countyStatusMW (reported)Grey Swan
1Serverfarm ARK (ARK1–ARK4)Clarksville / JohnsonUnder construction432 IT; ~660 on-site generation reported★ Covered
2Google West Memphis / Project PyramidWest Memphis / CrittendenUnder construction / phased600 reported (Aterio county est. 486)Coming soon
3AVAIO Digital LeoNear Wrightsville / PulaskiGround broken (developer reports)150 initial; 1,070 planned powerComing soon
4Sheridan / Clean Cloud EnergyNW of Sheridan / GrantProposed; EdgeConneX due diligence reported800 campusComing soon
5Google Port of Little Rock / Willowbend CapitalLittle Rock, near Sweet Home / PulaskiPlanned; redesign / permitting100+ reportedComing soon
6Conway / Forgelight Ventures LLCConway / FaulknerProposed; end user unnamed10 reportedComing soon
7Z Squared / Paradox Data AI-HPC campusNear El Dorado / UnionProposed; county moratorium reportedUp to 150Coming soon
8NewRays One (bitcoin mine)Bono community / FaulknerOperatingNot verifiedComing soon
9BTC Digital Manila (hosting)Manila / MississippiOperatingNot verifiedComing soon
10Project Pulse / DC Devco LLCGum Springs / ClarkCancelled (tracker reports)Not reportedComing soon
11Apollo Project (Stadium Partners, Garrison Data Partners)Helena Harbor / PhillipsCancelled (tracker reports)500 proposedComing soon
12Ritter Data Technology CenterJonesboro / CraigheadOperating colocation~0.75 (one directory)Coming soon
13TierPoint Little RockLittle Rock / PulaskiOperating colocationNot verifiedComing soon
14Bentaus / Chadbourn Infrastructure PartnersNorth of Texarkana / MillerAnnounced; approval and build not verified200 plannedComing soon
15BlockOps Moreland (bitcoin mine)Moreland / PopeOperating (operator says)Not disclosedComing soon
16BlockOps Russellville (bitcoin mine)Russellville / PopeOperating (operator says)Not disclosedComing soon
17BlockOps Helena-West HelenaFormer sawmill site / PhillipsApproved 2025; operating per operator8 available reportedComing soon
18Artemis Technologies Cave CityOutside Cave City / SharpConstruction began Apr 2025; completion unverifiedWithheld by companyComing soon
19Artemis Technologies MonticelloMonticello / DrewEarlier location; current operation unverifiedNot disclosedComing soon
20Artemis Technologies NewarkNewark / IndependenceEarlier location; current operation unverifiedNot disclosedComing soon
21Green Digital / Metahash Global Harrison mineBooneApplication withdrawn (May 2023)10 contracted (Chamber)Coming soon
22Mainstream TechnologiesDowntown Little Rock / PulaskiOperating colocation and hostingNot disclosedComing soon
NDASecond Grant County proposal
Highway 46 near Redfield, about 2,000 acres reported
Near Redfield / GrantReported; NDAs; developer name redactedNot publicUnnamed · Coming soon

A public directory lists 15 more legacy IT, university, and crypto sites. Those are directory leads, not verified new projects, and they are not used to fill Aterio's missing slots.

Our argument, clearly labeled

Secrecy keeps neighbors out of the room

There are two documented reasons names are missing: Aterio sells its full list, and real negotiations often run through NDAs, project LLCs, and unnamed end users. In Grant County, a second proposal near Redfield came to light in October despite signed NDAs, with the developer's name redacted.

Steve's civic argument is that the secrecy itself is the problem. When a community can't see who is coming, what was promised, or who will own the power, it can't judge whether it is a partner. That is an argument about how deals are made. It is not an allegation of a crime or misconduct by anyone.

Bring these to your council or quorum court

Four questions every community can ask

Who owns the generation?

Who pays for grid and water upgrades?

What education access and community benefit are in writing?

What happens if the customer leaves?

Public Answers

Questions from the public, answered for everyone

When someone asks something important through the hotline, we research it and post the answer here so everyone can read it. Names and identifying details are never published without permission.

See Public AnswersAsk a question
No answers posted yet

The first answers will appear here once questions come in.

For reporters and news outlets

The reference on Arkansas compute campuses and technology

Grey Swan keeps a sourced, regularly updated record of every named Arkansas compute-campus project we can document: status, megawatts, power, deal terms, owners and tenants where public, and what is still not public. Journalists are welcome to use it for background and cite it. Link the facility page and the date updated. If a figure looks off, tell us. We correct from public records, not from rumor.

We do not invent unnamed facilities. We do not allege misconduct. When a name is missing, we say so and point to the public reason we can document (a commercial paywall, an NDA, or a project LLC with no parent named).

Media questions: use the Compute Campus Hotline and include your outlet, or reach us through greyswancapital.ai/contact.

Every source linked
Each figure traces to a public record.
Unknowns marked
Nothing filled in by guesswork.
Dated updates
Each page shows when it was last checked.
Explainers
Short videos for each covered project.